public:t-720-atai:atai-18:lecture_notes_w2
                Table of Contents
T-720-ATAI-2018
Lecture Notes W3
Task-Environments: Key Concepts
| Task | A Problem that can be assigned. Typically comes with Instructions (guide to Solutions). | 
| Problem | A Goal with (all) relevant constraints (≈ requirements). | 
| Problem Family | A set of problems that are similar in some (important) ways; a Problem plus variations of that Problem. | 
| Goal | A (future) State to be attained, plus optional constraints on the Goal. | 
| State | A set of values (with error bounds) for a set of variables relevant to a Goal. | 
| Environment | A set of constraints relevant to a Task but not counted as part of a Task proper. | 
| World | A set of constraints that a set of Environments have in common. | 
| Constraint | A set of factors that limit the flexibility of that which it constrains. | 
| Solution | The set of (atomic) actions that can achieve a Goal. | 
| Action | The changes an Agent can make to variables relevant to a Task-Environment. | 
| Plan | A partial way to accomplish a Task. | 
| Instructions | Partial Plan for accomplishing a Task, typically given to an Agent along with a Task by a Teacher. | 
| Teacher | The Agent assigning a Task to another Agent (student), optionally in charge of Instructions. | 
Task-Environment Constraints
| Solution Constraint | Reduces the flexibility for producing a Solution. | 
| Task Constraint | Limits the allowed Solution Space for a Problem. Can help or hinder a Task to be achieved. | 
| Solution Space | The amount of variation allowed on a State while still counting as a Solution to a Problem. | 
| Task Space | The size of variations on a Task that would have be explored with no up-front knowledge or information about the Solution Space of a Problem. | 
Limited Time & Energy
| Task | All tasks have a limited time & energy: No Task exists that can be performed with infinite energy, or for for which infinite time is available for achieving. | 
| LTE | Limited Time & Energy. | 
Problems in Task-Environments
| Closed Problem | May be assigned as a Task with known Time & Energy for achieving a solution. | 
| Example | Doing the dishes. | 
| Plans for Closed problems | Can be reliably produced for closed problems, e.g. in the form of Instructions. | 
| Open Problem | A Problem whose solution is unknown and cannot be obviously assumed from analogy with similar problems whose solution is known. Cannot be guaranteed a solution with LTE. | 
| Example | Any research problem for which no known solution exists. | 
| Plans for Open problems | Cannot be reliably produced. | 
2018©K. R. Thórisson 
EOF
/var/www/cadia.ru.is/wiki/data/pages/public/t-720-atai/atai-18/lecture_notes_w2.txt · Last modified: 2024/04/29 13:33 by 127.0.0.1
                
                