public:t-513-lift-15-3:main
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
public:t-513-lift-15-3:main [2015/11/19 11:12] – [Basic Info] davidthue | public:t-513-lift-15-3:main [2024/04/29 13:33] (current) – external edit 127.0.0.1 | ||
---|---|---|---|
Line 1: | Line 1: | ||
======T-513-LIFT: | ======T-513-LIFT: | ||
- | ======(Under Construction) ====== | ||
===== Basic Info ===== | ===== Basic Info ===== | ||
- | * **Instructors: | + | * **Instructors: |
* **Contact: ** David: Office at RU, Venus floor 2, telephone 599-6412, e-mail davidthue[ ]ru.is | * **Contact: ** David: Office at RU, Venus floor 2, telephone 599-6412, e-mail davidthue[ ]ru.is | ||
- | * **Contact: ** Sam: samuelrees[ ]lhi.is | ||
* **Contact: ** Lóa: loaauduns[ ]lhi.is | * **Contact: ** Lóa: loaauduns[ ]lhi.is | ||
+ | * **Contact: ** Sam: samuelrees[ ]lhi.is | ||
* **Presentations and Discussions: | * **Presentations and Discussions: | ||
* **Pitches and User Tests: ** First two Monday mornings (RU V307) | * **Pitches and User Tests: ** First two Monday mornings (RU V307) | ||
Line 37: | Line 36: | ||
===== Project Work: Events & Deliverables ===== | ===== Project Work: Events & Deliverables ===== | ||
- | The term will consist of three major events. On “Pitch Day” (Monday Nov. 30, 10: | + | The term will consist of three major events. On “Pitch Day” (Monday Nov. 30, 10: |
During weeks 2 and 3 of classes (Nov. 30 to Dec. 11) each student team is expected to post brief daily progress updates using the course project tracking software. Each update is due by 7:00 on the weekday following the period of work covered (e.g., 7:00 on Wed for work done on Tue). | During weeks 2 and 3 of classes (Nov. 30 to Dec. 11) each student team is expected to post brief daily progress updates using the course project tracking software. Each update is due by 7:00 on the weekday following the period of work covered (e.g., 7:00 on Wed for work done on Tue). | ||
Line 43: | Line 42: | ||
Before Prototype Day, each team is expected to write and submit a Testing Plan (due by 17:00 on Dec. 4). **NB**: Any team that fails to submit their Testing Plan on time will be eligible to receive at most half of the maximum grades for both the Test Plan and Prototype Day. | Before Prototype Day, each team is expected to write and submit a Testing Plan (due by 17:00 on Dec. 4). **NB**: Any team that fails to submit their Testing Plan on time will be eligible to receive at most half of the maximum grades for both the Test Plan and Prototype Day. | ||
- | After Demo Day, each student is expected to write and submit a Post-Mortem that gives their personal account of working on their team’s | + | After Demo Day, each student is expected to write and submit a Post-Mortem that gives their personal account of working on their team’s |
^Description^Material^Quantity^Due^Weight^ | ^Description^Material^Quantity^Due^Weight^ |
/var/www/cadia.ru.is/wiki/data/attic/public/t-513-lift-15-3/main.1447931553.txt.gz · Last modified: 2024/04/29 13:32 (external edit)