======T-513-LIFT: | ======T-513-LIFT: | ||
- | ======(Under Construction) ====== | ||
===== Basic Info ===== | ===== Basic Info ===== | ||
- | * **Instructors: | + | * **Instructors: |
* **Contact: ** David: Office at RU, Venus floor 2, telephone 599-6412, e-mail davidthue[ ]ru.is | * **Contact: ** David: Office at RU, Venus floor 2, telephone 599-6412, e-mail davidthue[ ]ru.is | ||
+ | * **Contact: ** Lóa: loaauduns[ ]lhi.is | ||
* **Contact: ** Sam: samuelrees[ ]lhi.is | * **Contact: ** Sam: samuelrees[ ]lhi.is | ||
* **Presentations and Discussions: | * **Presentations and Discussions: | ||
- | * **Pitches and User Tests: ** First two Mondays 9: | + | * **Pitches and User Tests: ** First two Monday mornings |
* **Project Work** | * **Project Work** | ||
* **(with Instructors on-hand): ** Weekdays: 15:00-17:00 (V307) | * **(with Instructors on-hand): ** Weekdays: 15:00-17:00 (V307) | ||
* **(largely independent work): ** Weekdays: 9:00-12:00 (RU V307/LHÍ campus) | * **(largely independent work): ** Weekdays: 9:00-12:00 (RU V307/LHÍ campus) | ||
* **Project Tracking Software: ** [[https:// | * **Project Tracking Software: ** [[https:// | ||
- | |||
===== Description ===== | ===== Description ===== | ||
Line 37: | Line 36: | ||
===== Project Work: Events & Deliverables ===== | ===== Project Work: Events & Deliverables ===== | ||
- | The term will consist of three major events. On “Pitch Day” (Monday Nov. 30, 10: | + | The term will consist of three major events. On “Pitch Day” (Monday Nov. 30, 10: |
During weeks 2 and 3 of classes (Nov. 30 to Dec. 11) each student team is expected to post brief daily progress updates using the course project tracking software. Each update is due by 7:00 on the weekday following the period of work covered (e.g., 7:00 on Wed for work done on Tue). | During weeks 2 and 3 of classes (Nov. 30 to Dec. 11) each student team is expected to post brief daily progress updates using the course project tracking software. Each update is due by 7:00 on the weekday following the period of work covered (e.g., 7:00 on Wed for work done on Tue). | ||
Line 43: | Line 42: | ||
Before Prototype Day, each team is expected to write and submit a Testing Plan (due by 17:00 on Dec. 4). **NB**: Any team that fails to submit their Testing Plan on time will be eligible to receive at most half of the maximum grades for both the Test Plan and Prototype Day. | Before Prototype Day, each team is expected to write and submit a Testing Plan (due by 17:00 on Dec. 4). **NB**: Any team that fails to submit their Testing Plan on time will be eligible to receive at most half of the maximum grades for both the Test Plan and Prototype Day. | ||
- | After Demo Day, each student is expected to write and submit a Post-Mortem that gives their personal account of working on their team’s | + | After Demo Day, each student is expected to write and submit a Post-Mortem that gives their personal account of working on their team’s |
^Description^Material^Quantity^Due^Weight^ | ^Description^Material^Quantity^Due^Weight^ | ||
Line 65: | Line 64: | ||
=====Grading===== | =====Grading===== | ||
+ | |||
+ | For RU students, the table below will be used to calculate 100% of their grade for the 3-week course. For LHÍ students, the table below will be used to calculate a portion of the grade for their 5-week course at LHÍ. | ||
^Part of Course^Total Weight^ | ^Part of Course^Total Weight^ |